AIT Caps. Proj. no.ME-18-46 The development of a drone with obstacle picking robotic arm by Thant Myat Htoo
|
AIT Caps. Proj. no.ME-18-47 Development of automated forklift vehicle for a warehouse storage system by Ye Htet Naing
|
AIT Caps. Proj. no.ME-18-48 Development of an autonomous self-reconfigurable modular robot by Development of an autonomous self-reconfigurable modular robot
|
AIT Caps. Proj. no.ME-18-49 Design and development of EMG controlled bionic arm by Senanayaka, Chithrawaduge Gihan Maduranga
|
AIT Caps. Proj. no.ME-18-50 Development of a system to intercept a flying ball in a projectile motion using image processing by De Silva, Asurumuni Pasindu Manishka
|
AIT Caps. Proj. no.ME-18-51 Development of an autonomous cricket batsman robot by Herath, Herath Mudiyanselage Dilanka Uvanpriya
|
AIT Caps. Proj. no.ME-18-52 Development of a spherebot by Gunathilaka, Mestiyage Don Imantha Madusanka
|
AIT Diss. no.ME-08-01 The effect of heater-induced head protrusion on read/write ability and instability of perpendicular recording systems by Damrongsak Tongsomporn
|
AIT Diss. no.ME-08-02 Studies on thin film properties and application of self organized nanoparticles by Sujira Promnimit
|
AIT Diss. no.ME-09-01 The design, analytical modeling, simulation and fabrication of a wire-free, walking scratch-drive microrobot by Eakkasit Dumsong
|
AIT Diss. no.ME-10-01 Design, simulation and experimental study of a droplet-based PCR by electrowetting on dielectric by Kessararat Ugsornrat
|
AIT Proj no.MPM-CM-10-30 Design management in design-build project base on design team of contractor perspective by Nguyen Cao Bao Luat
|
AIT Proj no.MPM-CM-20-11 Causes and effects of delays to contractor in Vietnam : a case study of tm7 – BAC Giang complex building project by Truong Canh Thang
|
AIT Proj no.MPM-CM-20-12 Project management consultant’s roles, responsibilities and methods to manage design by Truong Quyen Tong
|
AIT Proj no.MPM-CM-20-13 Owner’s design and installation management in equipment and control instrument for EPC power plant project by Le Khac Nhut
|
AIT Proj no.MPM-CM-20-14 Assessing integrated delivery characteristics in hydropower plant projects in Vietnam : a case study of THACMO hydropower station extension project by Che Quang Tan
|
AIT Proj no.MPM-CM-21-01 Core management functions of small contractors : a case study of Tuan Danh Trading and Construction Company Limited by Le Tran Thanh Danh
|
AIT Proj no.MPM-CM-21-02 Coal procurement in EPC power plant projects : a case study of the process of bidding for imported coal in Duyen Hai thermal power company by Nguyen Tien Dung
|
AIT Proj no.MPM-CM-21-03 Green design management in urban planning project by Chau Ba Thien
|
AIT Proj no.MPM-CM-21-06 Integrated project delivery characteristics in construction projects : a case study of Maihouse Hoi An Luxury Golf and Resort project in Hoi An town city, Vietnam by Thai Phuong Nam
|