Mathematical modelling of unsteady flow in a tidal reach of the Bang Pakong River, Thailand by Emaduddin, Ahmad call number: AIT Thesis no. WA-79-29 |
Mathematical models for integrated planning of harvesting and processing of agricultural produce by Salde, Shiela Carillo call number: |
Mathematical simulation of flow in the Sedone river by Nguyen Huu-Thoi call number: AIT SSPR no. WA-89-07 |
Matrix structure in small scale & fast track construction project : a case study of office fitting-out projects by Nguyen Phong call number: AIT Proj. no.CM-09-04 |
Maturity, precooling and storage condition in relation to mechanical damage in mango variety Nam Dok Mai by Satriana, Viva call number: AIT Thesis no.AE-93-16 |
Maximization of system lifetime in body sensor networks by Mondal, Md. Nazrul Islam call number: AIT RSPR no.ICT-08-02 |
Maximize profit of construction contractor : case study for Nam Thinh M&E Contractor by Ha Chi Hghia call number: AIT Proj. no.MPM-CM-11-37 |
Maximize profit of construction contractor case study for nam thinh m&e contractor by Ha Chi Nghia call number: |
Maximizing barter trade over the long run by Hoang Than Anh Tuan call number: AIT Thesis no.CS-05-27 |
Maximizing energy generation from photovoltaic arrays through shading analysis from restricted urban roof area by Pathak, Abhishek call number: AIT Thesis no.ET-16-09 |
Maximizing operation of hydropower plant in Thailand by Inagaki, Mikihisa call number: AIT Thesis no. WA-85-12 |
MCFI-based animation tweening algorithm by Thanakorn Sakchaicharoenkul call number: AIT Diss. no.CS-06-03 |
Mean Packet delay analysis for limited service in Epon with Heterogeneous traffic and large round trip time by Atirut Utumtong call number: AIT Thesis no.TC-11-09 |
Measure of bullwhip effect : the cases of dual sourcing and VAR (1) demand process by Kittiwat Sirikasemsuk call number: AIT Diss no.ISE-13-05 |
Measure of bullwhip effect in supply chains : the case of ARIMA demand process by Vu Thi My Hanh call number: AIT Thesis no.ISE-07-05 |
Measure of bullwhip effect in supply chains : the case of independently & normally distributed demand process with (Q,R) inventory policy by Kanda Boonsothonsatit call number: AIT Thesis no.ISE-08-05 |
Measure of bullwhip effect in supply chains the case of arma demand process by Nguyen Duc Vu call number: AIT Thesis no.ISE-06-14 |
Measured vs. predicted settlements and pullout capacity in full scale reinforced embankment on DJM piles by Teerawat Duangchan call number: AIT Thesis no.GE-02-07 |
Measurement and analysis of Internet traffic in the ADSL network of HCM P&T by Pham Dang Cuong call number: AIT RSPR no.TC-05-09 |
Measurement and analysis of performances for productivity improvement : a case of the bus industry in Malaysia by Abdullah, Mah Lok call number: AIT RSPR no. IE-84-1 |