1 AIT Asian Institute of Technology

Clearing of alang-alang steppe land in South Sumatera, Indonesia

AuthorPramudya, Bambang
Call NumberAIT Thesis no. AE-81-21
Subject(s)Clearing of land--Indonesia--Sumatera, South

NoteA thesis submitted in partial fulfilment of the requirements for the degree of Master of Engineering, School of Environment, Resources and Development
PublisherAsian Institute of Technology
AbstractAn experiment was carried out on alang-alang area in South Sumatera., Indonesia, to compare three methods which might be used in alang-alang land clearing. These were mechanical, a combination of mechanical-biological, and a mechanical- chemical method. Each method was tested with three level treatments, totalling nine treatment combinations. Observations were taken to determine field performance of land clearing machinery and rate of alang-alang regrowth up to three months after land clearing. Comparison among the given treatments was evaluated in the term of costs and the rate of alang-alang regrowth after land clearing, both in its density and overground biomass. The lowest regrowth rate was found in the clearing using a combination of mechanical-biological method, whereas the mechanical method exhibited the highest regrowth rate. The mechanical-chemical method entailed the highest cost, while the costs of the mechanical-biological method were slightly higher than the mechanical method.
Year1981
TypeThesis
SchoolSchool of Environment, Resources, and Development
DepartmentDepartment of Food, Agriculture and Natural Resources (Former title: Department of Food Agriculture, and BioResources (DFAB))
Academic Program/FoSAgricultural and Food Engineering (AE)
Chairperson(s)Singh, Gajendra ;
Examination Committee(s)Olesen, Svend Elsnab ;Koike, Masayuki ;
Scholarship Donor(s)USAID-ASEAN;
DegreeThesis (M.Eng.) - Asian Institute of Technology, 1981


Usage Metrics
View Detail0
Read PDF0
Download PDF0