1 AIT Asian Institute of Technology

Optimisation of material requirements planning by mathematical programming

AuthorSen, Tapas Kumar
Call NumberAIT RSPR no. IE-83-17
Subject(s)Production planning--Mathematical models
NoteA research study submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology
PublisherAsian Institute of Technology
AbstractMaterials Requirements Planning approach has been widely accepted in manufacturing industries to determine when and how much to order and items as well as components. MRP approach finds out the answers to these queries by adjusting among Master Production Schedule , bill of material , capacity constraint and inventory situation. Under similar conditions and constraints , an aggregate production planning model has been developed to give optimal answer to those queries for single end item having several components. In addition the model incorporates important objectives like profitability and smooth labor relations.
Year1983
TypeResearch Study Project Report (RSPR)
SchoolSchool of Engineering and Technology
DepartmentDepartment of Industrial Systems Engineering (DISE)
Academic Program/FoSIndustrial Engineering (IE)
Chairperson(s)Oudheusden, Dirk L. Van
Examination Committee(s)Tabucanon, Mario T. ; Shanker, Kripa
Scholarship Donor(s)The Government of France
DegreeResearch Studies Project Report (M. Eng.) - Asian Institute of Technology, 1983


Usage Metrics
View Detail0
Read PDF0
Download PDF0