1 AIT Asian Institute of Technology

Optimization models for system availability : a case study of the boiler system at a gypsum board plant

AuthorChaiyawatana Arayangkool
Call NumberAIT Thesis no. IE-92-04
Subject(s)Maintainability (Engineering)--Mathematical models
Boilers--Maintenance and repair

NoteA thesis submitted in partial fulfillment of the requirement for the degree of Master of Engineering, School of Engineering and Technology
PublisherAsian Institute of Technology
Series StatementThesis ; no. IE-92-04
AbstractA boiler plant in a Gypsum Board Manufacturing Co. was selected for the purpose of the study. First, the background, the process and the major equipment's under study are described. Decision diagram for determining the maintenance policy for each equipment is developed with many concerned criteria . Mathematical models for scheduling optimal interval and control rule of preventive maintenance actions are developed . The system steady state availabilities are analyzed both before and after the preventive maintenance actions.
Year1992
Corresponding Series Added EntryAsian Institute of Technology. Thesis ; no. IE-92-04
TypeThesis
SchoolSchool of Engineering and Technology (SET)
DepartmentOther Field of Studies (No Department)
Academic Program/FoSIndustrial Engineering (IE)
Chairperson(s)Nagarur, Nagendra N.;
Examination Committee(s)Fujiwara, Okitsugu ;Bohez, Erik L.J.
Scholarship Donor(s)The Siam Cement Co. , Ltd . ;
DegreeThesis (M.Eng.) - Asian Institute of Technology, 1994


Usage Metrics
View Detail0
Read PDF0
Download PDF0