Perceived delays in construction projects in Nepal | |
Author | Prabhat Kumar, K. C. |
Call Number | AIT Thesis no.ST-97-34 |
Subject(s) | Construction industry--Nepal |
Note | A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering. |
Publisher | Asian Institute of Technology |
Series Statement | Thesis ; no. ST-97-34 |
Abstract | This study concerns an investigation into the causes of delays of construction in Nepal. The preliminary survey involving three parties owners, contractors, and consultants in the Nepalese construction industry is conducted. The objectives of the study is conducted to rank the factors that are causing delays. A questionnaire is designed and distributed to above said parties involved in ongoing projects at the time of study period. Separate list for each profession is prepared and ranked. A common list is prepared from the view points of all the respondents. Results indicate that shortages of construction materials, effects on weather, slow decision of owner, shortage of qualified workers, and poor relationship among parties are the most important factors responsible for delays of construction works. Joint efforts· of all the personnel involved in the construction industry with improved and change of method of construction are suggested recommendations for the reduction of such factors that are responsible for delays. |
Year | 1997 |
Corresponding Series Added Entry | Asian Institute of Technology. Thesis ; no. ST-97-34 |
Type | Thesis |
School | School of Engineering and Technology (SET) |
Department | Department of Civil and Infrastucture Engineering (DCIE) |
Academic Program/FoS | Structural Engineering (STE) /Former Name = Structural Engineering and Construction (ST) |
Chairperson(s) | Baba, Keizo |
Examination Committee(s) | Pichai Nimityongskul;Ogunlana, Stephen O.; |
Scholarship Donor(s) | Government of Japan;AITAA (Thesis Grant) |
Degree | Thesis (M. Eng.) - Asian Institute of Technology, 1997 |