Owner's contract management in multi subcontract packages project : a case study of FPT building project

AuthorHoang Thanh Ha
Call NumberAIT Proj. no.MPM-CM-15-18
Subject(s)Contracts--Management--Vietnam
Construction projects--Vietnam--Management

NoteA project submitted in partial fulfillment of the requirements for the degree of Master of Engineering (Professional) In Construction Engineering and Infrastructure Management, School of Engineering and Technology
PublisherAsian Institute of Technology
Series StatementProject ; no. MPM-CM-15-18
AbstractA construction activity is performed by contract. Each party involves in a project such as an owner, designer, and contractor, have to consider properly about contract and contract administration. There are so many items have to study and understand in deep in contract documents. The contract condition should be fair for both parties. The bad impact of a contract has caused many problems for sides, owner and contractor. In this report, the Author analyzes case study in FPT project to issue some strength, weakness and give some recommendation for framework of contract to improve contract administration for successful project in future.
Year2015
Corresponding Series Added EntryAsian Institute of Technology. Project ; no. MPM-CM-15-18
TypeProject
SchoolSchool of Engineering and Technology (SET)
DepartmentDepartment of Civil and Infrastucture Engineering (DCIE)
Academic Program/FoSConstruction Engineering and Infrastructure Management (Professional Master) (MPM-CM)
Chairperson(s)Hadikusumo, Bonaventura H.W.;
Examination Committee(s)Chotchai Charoenngam;Wasan Teerajetgul,;
DegreeProject (M. Eng.) - Asian Institute of Technology, 2015


Usage Metrics
View Detail0
Read PDF0
Download PDF0