1
Quality management of a project : a case study of owner's quality management during the building period | |
Author | Pham Dang Dung |
Call Number | AIT Proj. no.MPM-CM-13-22 |
Subject(s) | Construction projects--Vietnam--Management Building--Quality control--Vietnam |
Note | A project submitted in partial fulfillment of the requirements for the degree of Master of Engineering (Professional) in Construction Engineering and Infrastructure Management, School of Engineering and Technology |
Publisher | Asian Institute of Technology |
Series Statement | Project ; no. MPM-CM-13-22 |
Abstract | After many years implementing construction, domestic contractors and managers have accumulated many databases, important experiences to support them in the course of establishing schedule and quality construction as well as human resource in order that construction duration has executed quickly, quality construction has met the requirement. They have realized that project management is more and more important work to achieve the success of project. The project studied in this thesis is Workshops for lease in Longthanh Industry Zone. As a person of owner’s project management, the author will research about the owner’s strategic management applying on a real project in purpose to find the lack of management system and improve it. This case study mainly focused on researching the QMS of Sonadezi Longthanh Shareholding Company and controlling quality management of company’s project on building period. The contents of the thesis shall not only research about the strength and weakness points of the existing company’s QMS to propose method improvement Company’s QMS but also identify, analyze the causes of the project’s problems in order to find corrective & preventive actions. Based on the lack of existing QMS and the causes of nonconforming product, the author will propose the points need to improve for company’s QMS and introduce a detail strategy to help company managing quality construction better. Because the object of research is a real project and it is implementing so that the results are collected from the thesis’s analysis will help us to understand the existing problems of workshops for lease project and supply the useful experience lessons for same projects. |
Year | 2013 |
Corresponding Series Added Entry | Asian Institute of Technology. Project ; no. MPM-CM-13-22 |
Type | Project |
School | School of Engineering and Technology (SET) |
Department | Department of Civil and Infrastucture Engineering (DCIE) |
Academic Program/FoS | Construction Engineering and Infrastructure Management (Professional Master) (MPM-CM) |
Chairperson(s) | Chotchai Charoenngam; |
Examination Committee(s) | Hadikusumo, Bonaventuna H.W.;Santi Charoenpornpattana; |
Scholarship Donor(s) | Sonadezi Longthanh Shareholding Company; |
Degree | Project (M. Eng.) - Asian Institute of Technology, 2013 |