Owner's engineering management in an EPC project : a case study of civil work on song Hau 1 thermal power plant

AuthorTran Ngo Trung Hau
Call NumberAIT Proj. no.MPM-CM-19-18
Subject(s)Thermal power plant--Vietnam
Project management--Vietnam
Engineering--Management--Case studies

NoteA project submitted in partial fulfillment of the requirements for the degree of Master of Engineering (Professional) in Construction Engineering and Infrastructure Management
PublisherAsian Institute of Technology
AbstractThe performance of construction project in the form of EPC was applied in Vietnam from the late 90s of the twentieth century. Many EPC projects have been successful, however, many projects behind schedule, cost overrun too. The result of this situation is that the Owner’s engineering management has not been appropriate to attention. Better understanding of the situation, the report has been studied the Owner’s civil engineering management in EPC project as Song Hau 1 thermal power plant in EPC phase. The research also analyses strengths, weakness of the project and develops a framework of design management in EPC project. In addition, some recommendations were suggested to improve the engineering quality of power thermal projects.
Year2019
TypeProject
SchoolSchool of Engineering and Technology (SET)
DepartmentDepartment of Civil and Infrastucture Engineering (DCIE)
Academic Program/FoSConstruction Engineering and Infrastructure Management (Professional Master) (MPM-CM)
Chairperson(s)Hadikusumo, Bonaventura H.W.;
Examination Committee(s)Chotchai Charoenngam;Wasan Teerajetkul;
Scholarship Donor(s)Vietnam Oil and Gas Group (PVN) PetroVietnam;
DegreeProject (M. Eng.) - Asian Institute of Technology, 2019


Usage Metrics
View Detail0
Read PDF0
Download PDF0