1
Continuous flow shop scheduling : a case study of Additives and Petroleum Products Company in Hanoi, Vietnam | |
Author | Bui Huy Thanh |
Call Number | AIT Thesis no.ISE-05-52 |
Subject(s) | Production scheduling--Vietnam Petroleum products--Veitnam |
Note | A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Advanced Technologies |
Publisher | Asian Institute of Technology |
Series Statement | Thesis ; no. ISE-05-52 |
Abstract | This study introduces and finds a solution for continuous flow shop scheduling problem of grease production at Additive and Petroleum Production Company. The problem is a continuous flow shop scheduling problem with a large number of jobs and machines. Basing on the real situation, this study focuses on developing a mathematical model for continuous flow shop scheduling problem and find an effective heuristic algorithm that can help solving the problem with the objective is to minimize the total flow time. The heuristic algorithm of Rajendran and Chaudhuri (1993) has been chosen and applied here in this thesis. A computer program written in Visual C++ has also been developed for the selected algorithm. Data of 3 years are collected from the APP Company to verify the program. |
Year | 2005 |
Corresponding Series Added Entry | Asian Institute of Technology. Thesis ; no. ISE-05-52 |
Type | Thesis |
School | School of Advanced Technologies (SAT) |
Department | Department of Industrial Systems Engineering (DISE) |
Academic Program/FoS | Industrial Systems Engineering (ISE) |
Chairperson(s) | Huynh Trung Luong; |
Examination Committee(s) | Voratas Kachitvichyanukul ;Anulark Techanitisawad; |
Degree | Thesis (M.Eng.) - Asian Institute of Technology, 2005 |