1 AIT Asian Institute of Technology

Automation of a tunnel kiln

AuthorPham Hong Son
Call NumberAIT Thesis no.ISE-05-42
Subject(s)Tunnel kilns--Automation

NoteA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Advanced Technologies
PublisherAsian Institute of Technology
Series StatementThesis ; no. ISE-05-42
AbstractIn process of production, it is necessary to monitor process parameters as well as control all of equipments in production line. Applying process control system in industrial process provides to users many advantages such us labor reduction, improving quality of process, reducing maintenance time, low cost investment. Using latest automation technologies in implementing control system will bring a lot of benefit not only for users but also for developers. This study purposes to develop Supervisory Control and Data Acquisition system (SCADA) for controlling and monitoring burning process in tunnel kiln. Today the SCADA is expected to be the real-time component of a manufacturing facility's enterprise management and control system, affecting virtually every aspect of the operation and profitability of both continuous and batch processes. SCADA system for controlling and monitoring burning process in tunnel kiln will be created base on control system S7-300 of Siemens.
Year2005
Corresponding Series Added EntryAsian Institute of Technology. Thesis ; no. ISE-05-42
TypeThesis
SchoolSchool of Advanced Technologies (SAT)
DepartmentDepartment of Industrial Systems Engineering (DISE)
Academic Program/FoSIndustrial Systems Engineering (ISE)
Chairperson(s)Afzulpurkar, Nitin V.;
Examination Committee(s)Bohez, Erik L. J. ;Huynh Trung Luong;
Scholarship Donor(s)Asian Institute of Technology Fellowship;
DegreeThesis (M.Eng.) - Asian Institute of Technology, 2005


Usage Metrics
View Detail0
Read PDF0
Download PDF0