1 AIT Asian Institute of Technology

Constructability implementation during construction phase in a large high-rise building project in Vietnam

AuthorNguyen Anh Khoa
Call NumberAIT Thesis no.CM-12-11
Subject(s)Construction projects--Management--Vietnam
Tall buildings--Management--Vietnam

NoteA thesis submitted in partial fulfillment of the requirements for the Degree of Master of Engineering in Construction Engineering and Infrastructure Management, School of Engineering and Technology
PublisherAsian Institute of Technology
Series StatementThesis ; no. CM-12-11
AbstractIn this master project, I construct WIP models and calculate number of kanbansfor each operation throughout production lineto improve throughput and cycle timeas well as reduce WIP inventoryof a microprocessor assembly and test manufacturing factoryby integratingkey theory of constraints conceptstogether. I will also simulate Push system, Pull system, and CONWIP system based on data calculated from WIP model to have an overview oneachsystem and have a better choicein order to settle production lines with proper factory inventory, appropriate WIP buffered, and high utilization for both constraints and non-constraints to maximize throughput and minimize cycle time.
Year2012
Corresponding Series Added EntryAsian Institute of Technology. Thesis ; no. CM-12-11
TypeThesis
SchoolSchool of Engineering and Technology (SET)
DepartmentDepartment of Civil and Infrastucture Engineering (DCIE)
Academic Program/FoSConstruction Engineering and Infrastructure Management (CM)
Chairperson(s)Chotchai Charoenngam
Examination Committee(s)Hadikusumo, Bonaventura H.W.;Huynh Trung Luong
Scholarship Donor(s)Asian Institute of Technology Center in Vietnam;Asian Institute of Technology Fellowship
DegreeThesis (M.Eng.) - Asian Institute of Technology, 2012


Usage Metrics
View Detail0
Read PDF0
Download PDF0