Constructability implementation during construction phase in a large high-rise building project in Vietnam | |
| Author | Nguyen Anh Khoa |
| Call Number | AIT Thesis no.CM-12-11 |
| Subject(s) | Construction projects--Management--Vietnam Tall buildings--Management--Vietnam |
| Note | A thesis submitted in partial fulfillment of the requirements for the Degree of Master of Engineering in Construction Engineering and Infrastructure Management, School of Engineering and Technology |
| Publisher | Asian Institute of Technology |
| Series Statement | Thesis ; no. CM-12-11 |
| Abstract | In this master project, I construct WIP models and calculate number of kanbansfor each operation throughout production lineto improve throughput and cycle timeas well as reduce WIP inventoryof a microprocessor assembly and test manufacturing factoryby integratingkey theory of constraints conceptstogether. I will also simulate Push system, Pull system, and CONWIP system based on data calculated from WIP model to have an overview oneachsystem and have a better choicein order to settle production lines with proper factory inventory, appropriate WIP buffered, and high utilization for both constraints and non-constraints to maximize throughput and minimize cycle time. |
| Year | 2012 |
| Corresponding Series Added Entry | Asian Institute of Technology. Thesis ; no. CM-12-11 |
| Type | Thesis |
| School | School of Engineering and Technology (SET) |
| Department | Department of Civil and Infrastucture Engineering (DCIE) |
| Academic Program/FoS | Construction Engineering and Infrastructure Management (CM) |
| Chairperson(s) | Chotchai Charoenngam |
| Examination Committee(s) | Hadikusumo, Bonaventura H.W.;Huynh Trung Luong |
| Scholarship Donor(s) | Asian Institute of Technology Center in Vietnam;Asian Institute of Technology Fellowship |
| Degree | Thesis (M.Eng.) - Asian Institute of Technology, 2012 |