1
Collaborative strategy between stakeholders of hydropower and power intensive industry in Bhutan | |
Author | Gyamtsho, Karma |
Call Number | AIT Thesis no.CM-09-24 |
Subject(s) | Water-power--Bhutan |
Note | 105, [17] leaves : ill. |
Publisher | Asian Institute of Technology |
Series Statement | Thesis ; no. CM-09-24 |
Abstract | Bhutan still has the incidence to the poverty and unemployment which poses a challenge to industrial and hydropower sectors to create quality employment for the Bhutanese. The rapid industrial growth has increased the domestic power demand affecting the export quantity considerably. The power intensive industries will be affected if domestic tariff becomes par with export tariff. Therefore economic growth in Bhutan through export of electricity and industrial development have become like two sides of coins, both cannot be seen at same time. It will be prudent if industrialists are permitted to develop hydropower plant for their own consumptive uses and Royal Government of Bhutan continue to focus on revenue generation through export of electricity. As Bhutan has always chosen middle path of sustainable development guided by central development policy of Gross National Happiness, it is necessary to explore the collaborative issues and the approaches of the stakeholders involved in hydropower development for industrial uses before realigning country's development plan and policies to address these opportunities and challenges. A framework of collaborative strategy between hydropower generation and power intensive industries has to be sensibly derived based on collaborative issues and approaches of stakeholders for effective implementation without deterring the philosophy and strategy of Gross National Happiness |
Year | 2009 |
Corresponding Series Added Entry | Asian Institute of Technology. Thesis ; no. CM-09-24 |
Type | Thesis |
School | School of Engineering and Technology (SET) |
Department | Department of Civil and Infrastucture Engineering (DCIE) |
Academic Program/FoS | Construction Engineering and Infrastructure Management (CM) |
Chairperson(s) | Hadikusumo, B.H.W. |
Examination Committee(s) | Chotchai Charoenngam;Sutat Weesakul |
Scholarship Donor(s) | Austrian Development Agency (ADA) |
Degree | Thesis (M.Eng.) - Asian Institute of Technology, 2009 |