Construction management practices under construction material price fluctuation | |
Author | Piyachat Thaveelert |
Call Number | AIT Thesis no.CM-09-05 |
Subject(s) | Building materials--Prices Construction industry--Materials management Construction industry--Costs |
Note | 95 p. : ill. |
Publisher | Asian Institute of Technology |
Series Statement | Thesis ; no. CM-09-05 |
Abstract | A construction management is very important for a construction project. To be a successful project, it requires an appropriate management from contractors to cope with especially the situation in construction industry that is unaccustomed. According to the recent record, it has been found that construction industry faced with the situation of material price fluctuation. Due to the material cost usually consumes the highest proportion in the construction cost, it is very significant for contractors to know how to handle with the situation. This research aims to investigate the existing of construction management practices under the construction material price fluctuation and propose the recommendation to respond to the situation. The study uses a questionnaire as a research instrument to explore the existing practices of contractors. Two statistic methods were mainly used to analyze data from questionnaire surveys. The first analysis was descriptive analysis which used means and rankings to analyze. Second, the hypothesis testing was used to compare practices of the Bill of Quantity making and, procurement and employment among three groups of respondents. Those respondents are contractors focusing on private owners, public owners and both owners. In addition, another hypothesis testing was to compare practices relating to contract conditions between private owners and public owners through contractors' perceptions. At his point, the correlation between groups of contractors was also tested through the hypothesis testing of correlation. Finally, the factor analysis was carried out to find out the interrelationship among practices by grouping the variables. Result were found that for the Bill of Quantity making process, contractors prefer to find out the price trend by discussing the price trend with their suppliers with the highest mean. For the procurement and employment of contractors, contractors need to pay more attention on supplier selection process with the highest mean. For practices on contract conditions, it showed that the practice of the Specifying contract condition relating to furnishing materials clearly has the highest level of practice in private owners. In public owners, the Reasonable advance payment has the highest level of practice. The correlation between these two groups is also high positive correlation for practices on contract conditions. Last, the result of factor analysis showed that interrelationships of practices and it could be categorized into eight groups: Negotiating with Owners, Subcontractor Pricing Agreement, Government Pricing Index, Material Price Risk, Proactive Cost Control, Contractors' Historical Data, Contractor Procurement Strategy and Estimate Pricing |
Year | 2009 |
Corresponding Series Added Entry | Asian Institute of Technology. Thesis ; no. CM-09-05 |
Type | Thesis |
School | School of Engineering and Technology (SET) |
Department | Department of Civil and Infrastucture Engineering (DCIE) |
Academic Program/FoS | Construction Engineering and Infrastructure Management (CM) |
Chairperson(s) | Chotchai Charoenngam |
Examination Committee(s) | Hadikusumo, B.H.W.;Santi Charoenpornpattana |
Scholarship Donor(s) | RTG Fellowship |
Degree | Thesis (M.Eng.) - Asian Institute of Technology, 2009 |