Management of road system construction under the general construction planning by the year 2020 of Cau Giay District, Hanoi City | |
Author | Le Van Thu |
Call Number | AIT Proj. no.MPM-CM-11-49 |
Subject(s) | Road construction--Vietnam--Hanoi |
Note | A project report submitted in partial fulfillment of the requirements for the Degree of Professional Master in Project Management in Construction Engineering and Infrastructure an Management, School of Engineering and Technology |
Publisher | Asian Institute of Technology |
Series Statement | Project ; no. MPM-CM-11-49 |
Abstract | The district of Cau Giay is one of Hanoi’s districts achieving high-speed urbanization level. Along the district’s urbanization process, many new traffic systems have been constructed and developed, contributing to renovating and modernizing the general urban picture of Hanoi in general and of the district in particular. However, beside the achievements, there remained a lot of weaknesses in the district’s construction and management of urban traffic systems, especially in that of road systems. This study points out the significant problems existing in Cau Giay’s construction and management of road systems. Among those is the development of road systems in the districts are not catching up with Hanoi’s current urbanization process. In fact, the construction and management of urban landscape along the district’s streets is not efficient. The local technical infrastructures in some areas of the district are not modern and synchronous enough. There remain a lot of problems in the activities of technical infrastructure construction management in accordance with the district’s general construction plan. Based on the facts and figures, the study refers to the theories to describe the roles of road systems in the city’s urbanization process as well as the role of planning road networks in the city’s general urban plan. It also mentions the requirements and legal basis of road system management under the general construction plan. In the following part, the study use Cau Giay as a case study for this topic, in which solutions to all the existing problems in the district’s road systems management are analyzed so that the road system development is in accordance with the district’s general construction plan by 2020. To the study’s conclusion, it is essential to build traffic systems synchronized with the district’s other technical infrastructure systems. At the same time, there need to pay more attention in improvement of the local residents’ compliance with the regulations on construction. In addition, the study also emphasizes that importance of building short-term investment plan within the long-term plan for road system construction and attract the other investment sources beside the state budget by encouraging the various investment forms such as BT (Build-Transfer), BOT (Build-Operate-Transfer) and BTO (Build-Transfer-Operate). |
Year | 2010 |
Corresponding Series Added Entry | Asian Institute of Technology. Project ; no. MPM-CM-11-49 |
Type | Project |
School | School of Engineering and Technology (SET) |
Department | Department of Civil and Infrastucture Engineering (DCIE) |
Academic Program/FoS | Construction Engineering and Infrastructure Management (Professional Master) (MPM-CM) |
Chairperson(s) | Chotchai Charoenngam; |
Examination Committee(s) | Hadikusumo, Bonaventura H. W.;Santi Charoenpornpattana; |
Degree | Project (M.Eng.) - Asian Institute of Technology, 2010 |