The delay factors during construction phase of a residential project in Binh Duong, Vietnam : case study of an Dien Urbanized Residential Commercial Zone

AuthorBui Viet Thi
Call NumberAIT Proj. no.MPM-CM-11-31
Subject(s)Construction contracts--Vietnam--Binh Duong
Construction industry--Vietnam--Binh Duong

NoteA Project submitted in partial fulfillment of the requirement for the degree of Master of Engineering (Professional) in Construction Engineering and Infrastructure Management, School of Engineering and Technology
PublisherAsian Institute of Technology
Series StatementProject ; no. MPM-CM-11-31
Abstractproject is considered to be perfectly performed when it obtains three basic criteria such as completing on time within the planned budget, ensures the required quality such as winning the customer’s demands and meets labor safety requirements successfully in the performance stage. However, all the residential zones built in Viet Nam have had problems of project management leading to construction delays. Giving solutions for these problems has become project manager’s integral requirements. Delays in construction projects are able to be solved. In striving to give solutions for these problems, the significant factors influencing badly construction duration should soon be found out. Therefore, it is very critical to form a systematical approach that should be applied as a device for the investigation. This report will evaluate and analyze twenty factors which caused delay matters at Residential Zones and were fulfilled at Ben Cat District Binh Duong Province. The qualitative methods will be used, basically based on the principal of evaluating the risk level of factors having a negative influence on the construction schedule of the Residential Zone. It is conducted to realize the objective of the study. Finally, some solutions to deal with delay problems in the construction duration of projects are given in the text.
Year2011
Corresponding Series Added EntryAsian Institute of Technology. Project ; no. MPM-CM-11-31
TypeProject
SchoolSchool of Engineering and Technology (SET)
DepartmentDepartment of Civil and Infrastucture Engineering (DCIE)
Academic Program/FoSConstruction Engineering and Infrastructure Management (Professional Master) (MPM-CM)
Chairperson(s)Hadikusumo, Bonaventura, H.W. ;Oulawan Kulchartchai (Co-Chairperson);
Examination Committee(s)Chotchai Charoenngam;
DegreeProject (M. Eng.) - Asian Institute of Technology, 2011