1
Method & effectiveness of feasibility study in apartment project: a case study of Carina Plaza Building | |
Author | Le Mien Thuy |
Call Number | AIT Proj. no.MPM-CM-10-13 |
Subject(s) | Feasibility studies--Vietnam Apartment houses--Vietnam |
Note | A project report submitted in partial fulfillment of the requirements for the degree of Master of Engineering (Professional) in Construction Engineering and Infrastructure Management, School of Engineering and Technology |
Publisher | Asian Institute of Technology |
Series Statement | Project ; no. MPM-CM-10-13 |
Abstract | Viet Nam is the developing country which is booming economic and the new medium classification increasing rapidly. The movement of people from rural region to urban region is grow up every year. The population growing is 2% a year that is compressing of Housing Supply for social need. All the above figure is good reason for real estate business in Viet Nam. However in order to success in property business the Feasibility study stage is most important factor should be consideration. The subject of this study is analysis the method & effectiveness of feasibility study in Apartment Project. Base on theory and actual project the problem statement occurring in FS will be identified such as: Incorrect assumption, misunderstand the Demand of Market, cost & revenue estimate is not match reality, time schedule planning is not practice, forecasting of cash flow is wrong, mistake in term of FS calculation technical, lack of in formation in term of information of land. According the literature review the object study is summarized as Framework of FS in Apartment Project. To study the application of the framework in project case. To find the problem in FS for Apartment Project .To proposal the solution base on theory. With the real project Carina Plaza the analyze of the comparison between theory and the actual activity is show up the different and causing of it. The method of cost estimate is concentrate to study according the theory and project case. The revenue estimate is also access careful to ensure the catch flow management always is positive and project is archive. The final report specify the most important factor to impact the FS and a successful of project in medium apartment. The FS should be conducted by the people who is integrate knowledge such as: construction knowledge, financing, marketing, communication. |
Year | 2010 |
Corresponding Series Added Entry | Asian Institute of Technology. Project ; no. MPM-CM-10-13 |
Type | Project |
School | School of Engineering and Technology (SET) |
Department | Department of Civil and Infrastucture Engineering (DCIE) |
Academic Program/FoS | Construction Engineering and Infrastructure Management (Professional Master) (MPM-CM) |
Chairperson(s) | Hadikusumo, Bonaventura H. W.; |
Examination Committee(s) | Chotchai Charoenngam;Santi Charoenpornpattan; |
Degree | Project (M.Eng.) - Asian Institute of Technology, 2010 |