Project delays in mechanical factory construction project : a case study of a industry park, Ho Chi Minh City, Viet Nam

AuthorNguyen Duc Hung
Call NumberAIT Proj. no.CM-09-17
Subject(s)Construction contracts--Vietnam--Ho Chi Minh

NoteA project report submitted in partial fu lfillment of the requirements for the Professional Master Degree of Project Management in Construction
PublisherAsian Institute of Technology
Series StatementProject ; no. CM-09-17
AbstractIn current period (in Viet Nam), almost construction projects cannot be completed within specified time; and achieving the project inside pr edetermined time is the basic purpose of construction project control. That's the main purpose for those who work project managing. Generally, the problem involved with project delays are avoidable. In an effort to solve these problems, there are various strate gies have been applied. Among them, some factors were found as the main source lead to manage time in project efficiently. This final report analyzes factors affecti ng project time in c onstruction project in Viet Nam. The qualitative research is conduc ted to perform the objective of the research. Details collection is based on case study in mech anical factory construction project in Ho chi Minh City (Viet Nam). It will be found out from this study that ther e are a lot of factors affecting project time in mechan ical factory construction proj ect. Research problems is the development of the model involved with the f actors affecting project time in mechanical factory construction project. Finally, by these analysis, the factors fo r reducing project time in mechanical factory construction project will be found out and some strategies deal with project delays are proposed.
Year2009
Corresponding Series Added EntryAsian Institute of Technology. Project ; no. CM-09-17
TypeProject
SchoolSchool of Engineering and Technology (SET)
DepartmentDepartment of Civil and Infrastucture Engineering (DCIE)
Academic Program/FoSConstruction Engineering and Infrastructure Management (CM)
Chairperson(s)Hadikusumo, B. H. W.
Examination Committee(s)Chotchai Charoenngam ;Huynh Trung Luong
DegreeProject (M. Eng.) - Asian Institute of Technology, 2009