PPP Projects in Vietnam and Contractual Risk Management: A Case study of the Ninh Binh- Bai Vot Highway Project by Pham Dung Ha call number: AIT Proj. no.MPM-CM-17-03 |
Practical approach towards LDPC based DVC by Dinusha, R. G. call number: AIT Thesis no.ICT-08-10 |
Practical approaches and challenges of DCF valuation for mergers and acquisitions in Thailand : a case study of Siam Makro Public Company Limited by Worakit Chutimarat call number: AIT RSPR no.SM-24-05 |
Practical embedding stegosystems with security proofs by Natthawut Samphaiboon call number: AIT Diss. no.CS-10-02 |
Practical household use of the aquatabs disinfectant for drinking water treatment in the low-income urban communities of Dhaka, Bangladesh by Molla, Neelima Afroz call number: AIT Thesis no.EV-05-19 |
Practical irrigation scheduling in Punjab of Pakistan by Ahmad, Shahid call number: AIT Thesis no.AE-80-04 |
Practices and behavior of deep excavations in thick soft clay of Ho Chi Minh City, Vietnam by Nguyen Kiet Hung call number: |
Practices of contractor schedule/cost planning and control : a case study of resettlement high rise building project in Hochiminh City by Bui Van Cuong call number: AIT Proj. no.CM-09-20 |
Practices of labor export in Vietnam by Nguyen Thi Minh Phuong call number: AIT RSPR no.SM-07-88 |
Practices of owner project management team in life cycle of residential development projects of Nepal by Panthi, Rashmi call number: AIT Thesis no.CM-19-01 |
Prawn farming in the brackishwater areas of the Philippines : a study of the socio-economic characteristics of the prawn operators and coastal households in Camarines Sur by Rodriguez, Melinda Ricafort call number: AIT Thesis no. HS-88-28 |
Pre-consolidation with vertical drains influence of the permeability of the drain laboratory test and finite difference analysis by Handali, Samuel call number: AIT Thesis no. GT-81-06 |
Pre-construction delay in building project development : a case study of Investco Babylon Projecy in Ho Chi Minh City by Nguyen Tran Tuong Ly call number: AIT Proj. no.MPM-CM-11-21 |
Pre-design determination of project duration and cost by Sadashiv, Modak Chandrashekhar call number: AIT Thesis no. ST-79-20 |
Pre-feasibility of selected chemical products in Thailand by Dalawampu, Miguel M. call number: AIT Thesis no. IE-81-19 |
Pre-feasibility study for ecotourism in Koh Mak, Trat province, Thailand by Sankamon Ubonpong call number: AIT RSPR no.SM-00-18 |
Pre-Feasibility study for thu thiem project in Ho Chi Minh City, Vietnam by Nguyen Dac Trung call number: |
Pre-project planning in practice : a case study of PetroVietnam by Nguyen Thi Minh Hoa call number: AIT Thesis no.ST-03-61 |
Pre-tensioned ferrocement : behaviour in direct tension an by Hoang Vinh Thang call number: AIT Thesis no. ST-85-11 |
Pre-treatment of domestic solid waste by enhanced leaching by Dayanthi, W. K. C. N. call number: AIT Thesis no. EV-03-26 |