Browse by Title


Concurrency control mechanisms : an evaluation
by Khatry, Suresh
call number: AIT RSPR no. CS-88-11
Concurrent engineering for product development in a supply chain
by Vo Dinh Nhat Quang
call number: AIT Thesis no. ISE-01-27
Concurrent engineering using CIMOSA enterprise modeling : a case study
by Selestine, George P.
call number: AIT Thesis no. ISE-97-49
Condition and value of secondary forest in Laos : an analysis along a gradient of accessibility in Luang Prabang
by Puwadej Meknapapong
call number: AIT Thesis no.NR-08-09
Condition assessment for a border logistics hub : Lao Cai Province, Vietnam
by Tran Viet Dung
call number: AIT Thesis no.CM-09-22
Conditioning and dewatering of sludge from a Bangkok waterworks
by Teerawat Luangurai
call number: AIT Thesis no.EV-90-8
Condominium housing development in Haikou City, PRC
by Huang, Weiyuan
call number: AIT RSPR no.HS-93-12
Conducive organizational infrastructure for training activities : a case study of the Nepalese construction sector
by Bajracharya, Arun
call number: AIT Thesis no.IP-98-04
Conduction drying of paddy for optimum milling quality
by Nitat Tangpinijkul
call number: AIT Thesis no. AE-87-27
Conduction drying of paddy using a rice-husk-fired furnace
by Suhargo
call number: AIT Thesis no. AE-82-13
Conduction drying of parboiled paddy in a screw conveyor heat exchanger
by Obaldo, Leonard Ganir
call number: AIT Thesis no. AE-83-16
Configuration and application development using profibus based network
by Truong Huong Lien
call number: AIT Thesis no.ISE-00-45
Configure and assembly the FMCW radar
by Aung Myint Myat Kyaw
call number: AIT Caps. Proj. no.TC-15-13
Configuring neural networks as iterated function systems
by Shaukat, S. Muhammad Shamshad
call number: AIT Thesis no. CS-92-23
Confirm feasibility of robotization by simulation
by Supanit Panichakul
call number: AIT Thesis no. ISE-98-19
Conflict and conflict management in joint ventures : the Thai partner perspectives
by Sajee Bushyacharu
call number: AIT RSPR no. SM-96-50
Conflict dynamics in dam construction projects : a case study of Middle Marsyangdi Hydroelectric Project, Nepal
by Mahato, Braj Kishor
call number: AIT Thesis no.CM-08-05
Conflict management during negotiation and launch stages of joint ventures : typical case studies in Thailand
by Jiang, Yong
call number: AIT RSPR no. SM-96-28
Conflict modelling and resolution : the case of the Bangkok Mass Transit System Project
by Janevit Siriassakul
call number: AIT Thesis no. IE-94-16
Conflict prevention for the oil and gas platform decommissioning process in Thailand
by Khan, Waqar Ali
call number: AIT Thesis no.ST-02-22