Browse by Title


An integrated approach to irrigation system assessment and management of selected projects in Tha Chin Basin, Thailand
by Sanidda Tiewtoy
call number: AIT Diss. no.WM-09-04
An integrated approach to part selection and loading problem in FMS using genetic algorithm
by Nguyen Van Duc
call number: AIT Thesis no.ISE-02-30
An integrated approach to real-time optimal operation of an irrigation water system : a case study for Nam Oon Irrigation Project, Thailand
by Watchara Suiadee
call number: AIT Diss. no.WM-05-02
An integrated approach to the analysis of small-holder sugar cane production in Indonesia
by Heri Moerdiyono
call number: AIT Thesis no. IE-91-20
An integrated behavioral model with micro-simulation for urban freight movement
by Wisinee Wisetjindawat
call number: AIT Thesis no.TE-02-08
An integrated complaint management system for Thai E-government
by Patcharaporn Panwong
call number: AIT Thesis no.IM-07-18
An integrated database management system for structural engineering
by Somporn Attasaeranewong
call number: AIT Diss. no. ST-93-01
An integrated framework for the visualization and management of an ontological knowledge-based system
by Benya Rungsrisutthiwong
call number: AIT Thesis no.IM-18-05
An integrated framework of MRP II and JIT using optimal junction point approach
by Kumar, Lala Anil
call number: AIT Thesis no.ISE-06-42
An integrated geospatial modeling of coastal city growth in Thailand
by Kritsana Kityuttachai
call number: AIT Diss. no.RS-16-01
An integrated GIS and remote sensing approach for monitoring urban growth pattern in Pathumthani, Thailand
by Arthit Limpiyakorn
call number: AIT Thesis no.RS-06-28
An integrated ICT-based application of satellite remote sensing and AHP for land suitability analysis for urban development in Khost city, Afghanistan
by Haider, Muhammad Sharif
call number: AIT RSPR no.ICT-19-05
An integrated Internet geographic information system for crime control
by Roongrasamee Boondao
call number: AIT Diss. no.IM-06-01
An integrated inventory methodology for seismic damage assessment of Bangkok.
by Suchada Padermkul
call number: AIT Thesis no.ST-99-29
An integrated kinetic model for design and operation of solar-septic tanks
by Tatchai Pussayanavin
call number: AIT Diss no.EV-15-03
An integrated management modeling for a complex water resources system : The Lower Dong Nai River Basin
by Le Van Duc
call number: AIT Diss. no. WM-99-01
An integrated model for organic and nutrient removal by duckweeds-based wastewater treatment system (DUBWAT)
by Krishna, K. C. Bal
call number: AIT Thesis no.EV-07-2
An integrated model to assess technological alternatives in rural areas of Tanzania
by Chungu, Abdallah S.
call number: AIT Diss. no.AE-93-01
An integrated MRP-II and quality control system
by May Ohnmar Kyi
call number: AIT Thesis no. ISE-96-17
An integrated open framework for mining sensor data
by Ren, Jianli
call number: AIT Thesis no.CS-05-17